Oil & Gas Service: Turnkey EPC Status: In Progress

Trans-Regional Gas Transmission Line & Pressure Reduction Stations

EPC execution of 115km of 28-inch high-pressure natural gas transmission pipeline, including 3 custody transfer metering stations and horizontal directional drilling (HDD) river crossings.

Trans-Regional Gas Transmission Line & Pressure Reduction Stations

Project Overview & Context

Currently under active construction, this strategic pipeline segment will transport dry gas to regional power plants and heavy ceramic manufacturing hubs. Yiba Ventures is deploying automated mechanized orbital welding units and phased array ultrasonic testing (PAUT) across all joints.

Specialized environmental protection measures are in place across wetlands and sensitive wildlife corridors.

Engineering Scope of Work & Execution Details

• Topographical LiDAR surveys and geotechnical route mapping • Procurement of 115km API 5L X70 SAW pipes with 3-layer PE coating • 4 major river crossings executed via Horizontal Directional Drilling (HDD) • SCADA telemetry and fiber optic leak detection cabling

Delivered Outcomes & KPI Impact

On track for 2026 commissioning. 68% milestone reached on schedule with 2.4 million safe hours recorded.

Project Site & Fabrication Gallery

Site photo

Project Metadata & Details

Client Organization
Confidential Client
Project Location
Ajaokuta - Kaduna Corridor, Nigeria
Sector Category
Oil & Gas
Service Scope
Turnkey EPC
Execution Timeline
Jan 2024 — Dec 2026
Status
In Progress

Planning a Similar Project?

Engage Yiba Ventures engineering teams early in your feasibility or tender cycle for accurate cost modeling and risk mitigation.

Request Quotation (RFQ) Contact Engineering Lead

Privacy Notice & Cookie Preferences

In compliance with NDPR & international data privacy standards

Yiba Ventures Limited uses strictly necessary cookies to guarantee portal security, CSRF protection, and session integrity. With your consent, we also use analytical and performance cookies to understand how industrial clients explore our EPC engineering portfolios, calculate RFQ requisitions, and access technical dossiers.

Granular Cookie Settings

Strictly Necessary Cookies Always Active

Essential for system authentication, RFQ uploads, CSRF defense, and secure session management. Cannot be disabled.

Analytics & Performance Cookies

Collects aggregated, anonymous telemetry on page visits and download frequency to help improve site speed and service navigation.

Functional & Interactive Cookies

Remembers your support ticket filters, recent RFQ form selections, and corporate contact preferences.